Login
One Asset.
A Complete History.
Equipment Passport
Road Plate
SHP-RP-000001
In Service
Fully inspected and fit for use.
▥
Manufacturer
St Helens Plant Ltd
St Helens, United Kingdom 🇬🇧
▣
Date Manufactured
14 September 2026
Serial / Batch: SHP-RP-0926-001
Drawing Ref: SHP-RP-2400-001
◉
Last Inspection
View certificate →
14 September 2026
by Simian Risk
✓ PASSED
▣ Asset Details
- AssetKey ID
- SHP-RP-000001
- Asset Type
- Road Plate
- Manufacturer
- St Helens Plant Ltd
- Manufactured
- 14/09/2026
- Serial / Batch
- SHP-RP-0926-001
- Dimensions
- 2400 × 1200 mm
- Thickness
- 20 mm
- Material
- Mild Steel (S355)
- Weight
- 320 kg (approx)
- Drawing Reference
- SHP-RP-2400-001
- Finish
- Galvanised / Anti-slip
- Current Location
- Manchester Depot
- Owner
- ABC Scaffolding Ltd
- Status
- ✓ In Service
▤ Key Documents
▣ Complete Asset History
14 Sep 2026
▥
ManufacturedSt Helens Plant LtdBatch: SHP-RP-0926-001
15 Sep 2026
◯
Initial InspectionSimian Risk✓ Passed
18 Sep 2026
♟
Supplied to CustomerABC Scaffolding LtdLocation: Manchester
12 Jan 2027
⌕
Periodic InspectionSimian Risk✓ Passed
03 Apr 2027
▲
Damage ReportedCrack to corner section
03 Apr 2027
⊖
QuarantinedRemoved from service
08 Apr 2027
▰
Returned to SHPTransported to St Helens Plant
20 Apr 2027
⌕
Repaired / ReconditionedSt Helens Plant Ltd
22 Apr 2027
⌕
Post-Repair InspectionSimian Risk✓ Passed
25 Apr 2027
✓
Returned to ServiceAvailable for use
✚ Current Status
✓
IN SERVICEFully inspected and fit for use.
▣
Next inspection due14 March 2027
(6 months)▣ Equipment Photos
View all →


● Location
View on map →●
Manchester DepotABC Scaffolding LtdUnit 4, Industrial EstateManchester, M12 9AB
ASSETKEY
More than an inspection.
A complete history.
Improve Safety
Reduce Downtime
Extend Asset Life
Add Value